Modular, reliable and efficient – with fast delivery and installation

Penthouses are a primary product of EAS OSC. These self-contained systems provide customers many advantages including reducing field installation costs and schedules, eliminating construction risk and virtually doing away with “budget creep.” All EAS construction work is performed more safely with tradesmen working on the plant floor instead of on top of a roof. EAS OSC penthouse designs can integrate more equipment into a single unit thereby reducing valuable building square footage while maintaining critical service and maintenance access. Pre-commissioning and system checks can be performed in the plant prior to installation. EAS OSC also significantly reduces the site man-hours needed for unit completion by the trades. This reduction lowers cost and saves time.

Benefits

Eliminates weather delays

Lower operating cost

Decreased day on capital expenditure

Accelerated Schedule

Scalable, Flexible and Reliable

Improved jobsite safety

Eliminates Change Orders

Features

Improved Quality with proven QA/QC system in manufacturing environment

Interior floor to steel clearance can exceed 12 feet

Design incorporates all infrastructure down to rack level

Redundancy incorporated into each design

Improved jobsite safety

Designed to meet seismic criteria of site

Downloads

Contact us

Please fill in the form if you have an enquiry. Fields indicated with an asterisk (*) are required. We aim to respond within 1-2 business days depending on the scope of your enquiry.

For an existing installation, please provide the necessary details to identify the installation and the equipment.